Niazi, Hasibullah


Name Niazi, Hasibullah
Ethnic backgr. Tajik
Date of birth 1986
Function/Grade Volunteer Officer in Wolesi Jirga
History and Biodata

Hasibullah Niazi Hasib Niazi

Mobile: 0093 766 602 592

E-mail: hasibullahniazi15(at)gmail.com


2. Previous Functions:

Officer for Construction projects for building of ANA, ANP more than 7 years. Client for all projects was USACE (United States Army Corps of Engineers). Detail of his job including location and projects see below more backgrund.
Executive Director Zarin Kan Mining (201510-201608)
Volunteer Officer in National Assembly (Lower House – Wolesi Jirga) in International Relation Directorate of Islamic Republic of Afghanistan (January 2018 – present).


3. Biodata:

Hasibullah Niazi s/o Dr. Azimullah Niaz i(Member of Kabul Provincial Council) was born 1986 in Kabul province, 7th district of Wasil Abad, Chardehi. During the Russian war he migrated to Peshawar – Pakistan for safe life and better education. He completed his Secondary Education (12th class) – High School period and graduated from Mowlana Jami High School located in Peshawar on August 2004. Following that he started studies at Civil Engineering faculty in Ariana University located in Peshawar, Pakistan,  (Sept 2014). He graduated as B.A. on Nov 2008 from Paktia (Ariana University). Prior and after graduation from University he worked as Trainee and Laboratory Officer in ACLU (Afghan Construction & Logistics Unit) and TI (Technologists Incorporated) in Construction Material Quality Control testing section.
 

After graduation from University from January 2009 till October 2015 he has been working with different International and Local Construction Companies in various provinces of Afghanistan as Quality Control / Quality Assurance / QCS Admin / Civil Engineer under USACE (United States Army Corps of Engineers) on Construction projects of ANA (Afghan National Army), ANP (Afghan National Police), Police Headquarters.
 

On August 2016, Niazi got a job as Quality Assurance with Ministry of Urban Development and Housing for Restoration & Consolidate of Darulaman Palace (RCDP) and Restoration & Consolidate of Historical Monuments and Mosques and served till December 2017.
 

Niazi currently works as Volunteer Officer in National Assembly (Lower House – Wolesi Jirga) in International Relation Directorate of Islamic Republic of Afghanistan (January 2018 – present).

Niazi’s native language is Dari (Persian). He can speak Pashto, English, Urdu, Tagalog (Filipino) and German.

 

More work Background in Details:

1. SWIZ HEWADWAL JV (Company), Takhar and Kunduz (Job location), January 2009- March 2009 (duration), Quality Control Manager & Safety Officer (Position)

2. Asian Atlas Construction and Engineering Network – ACEN, $16 Million ANP UP Headquarters, Zabul – Qalat, Mar 2009- May 2010, Quality Control Officer & Lab Officer

3. Road and Roof Construction Company –RRCC, 15 Million ANP Headquarter Project, Kandahar, May 2010 – August 2010, Quality Control Manager

4. ACI SCC JV, Aug 2010 – May 2012, Quality Control Inspector / Manager

17 Million USD ANA 215th HQ Facility, Camp Shorabak, Helmand, Mar 2011 – May 2012

6 Million USD Waste Management Area in FOB Wolverine, Zabul - Qalat, Nov 2010 – Mar 2011

17 Million USD ANA Kandak Project, Qala-e-Naw, Badghis, Aug 2010 – Nov 2010

5. METAG, Jun 2012 – Oct 2012, 52 Million USD ANA 4/205th Brigade Garrison - Phase 1 Uruzgan -  Tarin Kowt, Quality Control Manager

6. LAKESHORE TOLTEST, Nov 2012 – Sep 2013 “project suspended by Client”, 72 Million USD ANA 2/205th Brigade Garrison, Phase 1 Nimroz, Delaram, QCS Admin - Document Controller “specifically for QC department” / Quality Control Assistant

7. Caddell Construction Co Inc, Overseas Buildings Operations OBO, United States Department of State, Dec 2013 – Jan 2014, 850 Million USD United States of America Embassy at Kabul, Afghanistan, Quality Control Inspector - Civil

8. YARESTAN HERAT CONSTRUCTION & LOGISTIC COMPANY – YHCLC, LAKESHORE TOLTEST (Prime Contractor), Jan 2014 – May 2014 (project suspended by client), 72 Million USD ANA 2/215th Brigade Garrison, Phase 1 Nimroz, Delaram, QCS Admin - Document Controller “specifically for QC department” / Quality Control Assistant

9. Zarin Kan Mining, May 2014 – Jun 2015 (Operations suspended), Executive Director / Vice President

10. MACRO VANTAGE LEVANT (MVL), Jun 2015 – Oct 2015 (project completed), 160 Million USD ANA 2/201st Brigade Garrison - Khas Kunar - Kunar province, CAD Operator

11. Zarin Kan Mining, Oct 2015 – Aug 2016, Vice President

12. Ministry of Urban Development and Housing, Islamic Republic of Afghanistan, Aug 2016 – Dec 2017 (Contract finished), Restoration & Consolidate of Historical Monuments and Mosques, 20 Million USD Restoration & Consolidate of Darulaman Palace RCDP.

 